Updated Master Plan Drawings
By Jeff Gold 8.30.11
These drawings include:
Also attached here is a memo to the RE focus group that summarizes the concepts for the RE facilities in the draft master plan; these are based on the “program”, which has also been updated.
The following is a summary of the changes made to the Social Hall and Site Plan:
- The Social Hall is configured with an addition that includes the new welcome hall and new multi-purpose room, but does not include the long-range provision for a future sanctuary
- The Welcome Hall is configured to provide for a ‘tabling area’ outside of the main circulation floor space
- The back stage area includes connecting doors to the exterior on the east side and connecting doors on the west side through the storage room to the music room and multi-purpose room (to provide additional prep area for large productions)
- The back stage area includes a half bathroom and small ‘changing’ cubbies
- The pedestrian/bike trail from Sierra Blvd to the center of campus is realigned to pass between the oak and redwood groves.